Step 4 - Trial Production
We’ll arrange and execute a test run to ensure that everything goes as planned
With the full SOP in place, it’s time for stuff training on your product and a limited production run to validate the procedures. Think of this as a dress rehearsal before mass production.
Service Includes
A validation small run (typically 500-1000). Final checks before mass production.
Costs Involved
The price per piece